Monday, April 30, 2007
KBR along with joint venture partners, JGC, Technip and Snamprogetti, recently executed a contract with Nigeria LNG Limited (NLNG) for the preparation of project specifications and front end engineering and design (FEED) for a two 8.5 million metric tons per annum LNG plant expansion by Nigeria LNG termed the "NLNGSevenPlus" Project.
Source : Scandania Oil & gas